Required Inspection Codes By Project
(*) indicates additional inspection may be required due to scope of work or permit trade.
| Project Description | Required Inspections | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DEPARTMENT | Building | Electrical | Mechanical | Plumbing | |||||||
| A/C REPLACEMENT | E= (Electrical Final) | H= (Heating Final) | |||||||||
| ADDING RECEPTACLES | ER (Electrical Rough), ER= (Electrical Rough and Final), ESL* (Electrical Slab*), E= (Electrical Final) | ||||||||||
| ADDITION | BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA (Building Lath), BTR (Building Tile Roof), BEN=* (Building Energy Final*), B= (Building Final) | ES* (Electrical Service*), ER (Electrical Rough), E= (Electrical Final) | HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) | PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final) | |||||||
| BASEMENT FINISH | BFR (Building Frame), B= (Building Final) | ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ESL* (Electrical Slab*), EP* (Electrical Panel*), E= (Electrical Final) | HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) | PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final) | |||||||
| BATH EXHAUST FAN (NEW) | ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | H= (Heating Final) | |||||||||
| BOILER INSTALL (NEW) | ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | HI (Heating Inside), HWP (Heating Process Steam and Water Pipe), H= (Heating Final) | PTO* (Plumbing Top Out*), P=* (Plumbing Final*) | ||||||||
| BOILER REPLACEMENT (W/ VENT) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final) | HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) | PTO* (Plumbing Top Out*), P=* (Plumbing Final*) | ||||||||
| DECK | BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), B= (Building Final) | ES* (Electrical Service*), ER* (Electrical Rough*), ER= (Electrical Rough and Final), E= (Electrical Final) | |||||||||
| DECK STAIR REPLACEMENT | BFR (Building Frame), B= (Building Final) | ES* (Electrical Service*), E=* (Electrical Final*) | H= (Heating Final) | ||||||||
| DECK WITH COVER (NO ELECTRIC) | BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) | ||||||||||
| DECK WITH COVER (W/ ELECTRIC) | BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) | ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | |||||||||
| DETACHED GARAGE (W/O POWER) | BFT (Building Footing), BFN (Building Foundation), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) | HRP (Heating Refrigeration Piping) | |||||||||
| DETACHED GARAGE (W/ POWER) | BFT (Building Footing), BFN (Building Foundation), BFI (Building Foundation Insulation), BFR (Building Frame), BIN* (Building Insulation*), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN=* (Building Energy Final*) | ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ES=* (Electrical Service and Final*), EUG* (Electrical Underground*), E=* (Electrical Final*) | HRP (Heating Refrigeration Piping) | ||||||||
| ELECTRIC PANEL CHANGE-OUT | ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), EP (Electrical Panel), E= (Electrical Final) | ||||||||||
| ELECTRIC PANEL UPGRADE | ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), E= (Electrical Final) | ||||||||||
| ELECTRIC SUB PANEL (NEW) | ER=* (Electrical Rough and Final*), EP (Electrical Panel), E= (Electrical Final) | ||||||||||
| FIREPLACE FRAMING | BFR (Building Frame), B= (Building Final) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final) | |||||||||
| FURNACE REPLACEMENT | E=* (Electrical Final*) | H= (Heating Final) | |||||||||
| GARAGE CONVERSION | BIN (Building Insulation), BLA (Building Lath), B= (Building Final), BEN=* (Building Energy Final*) | ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) | HI* (Heating Inside*), HRR (Heating Residential Rough), H= (Heating Final) | PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P=* (Plumbing Final*) | |||||||
| HOT TUB (NEW) | ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final) | ||||||||||
| INTERIOR REMODEL (NON-STRUCTURAL) | BFR (Building Frame), B= (Building Final) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) | HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) | PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final) | |||||||
| INTERIOR REMODEL (STRUCTURAL) | BFR (Building Frame), B= (Building Final) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) | HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) | PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final) | |||||||
| KITCHEN HOOD (NEW) | ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | H= (Heating Final) | |||||||||
| METER RESET (ELECTRIC) | ES (Electrical Service), ES=* (Electrical Service and Final*), EMR* (Electrical Meter Release*), E= (Electrical Final) | ||||||||||
| METER RESET (GAS) | HI (Heating Inside), H= (Heating Final) | ||||||||||
| NEW A/C | ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final) | H= (Heating Final) | |||||||||
| NEW EXTERIOR GAS LINE | HO (Heating Outside), H= (Heating Final) | ||||||||||
| NEW FIREPLACE INSTALL (GAS) | BFR (Building Frame), B= (Building Final) | ER (Electrical Rough), ER=* (Electrical Rough and Final*), E= (Electrical Final) | HI (Heating Inside), HO* (Heating Outside*), HV (Heating Vent), H= (Heating Final) | ||||||||
| NEW INTERIOR GAS LINE | HI (Heating Inside), H= (Heating Final) | ||||||||||
| NEW WOODBURNING STOVE | BFR (Building Frame), B= (Building Final) | ||||||||||
| PATIO COVER | BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) | ES* (Electrical Service*), ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) | |||||||||
| PATIO ENCLOSURE | BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) | ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | HI* (Heating Inside*), HO* (Heating Outside*) | ||||||||
| PERGOLA | BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) | ES* (Electrical Service*), ER* (Electrical Rough*), ERS* (Electrical Rough and Service*), ER=* (Electrical Rough and Final*), EUG* (Electrical Underground*), E= (Electrical Final) | |||||||||
| PV SOLAR (NEW GROUND MOUNT UP TO 7FT) | ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final) | ||||||||||
| PV SOLAR (NEW GROUND MOUNT OVER 7FT) | BFT (Building Footing), B= (Building Final) | ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final) | |||||||||
| PV SOLAR (NEW ROOF MOUNT) | BPV (Solar Attachment), B=* (Building Final*) |
ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final)
BPV (Solar Attachment, Electric-Only Permit) |
|||||||||
| PV SOLAR (REMOVE AND REPLACE) | BPV (Solar Attachment), B= (Building Final) | ER* (Electrical Rough*), E= (Electrical Final), BPV (Solar Attachment, Electric-Only Permit) |
|||||||||
| RE-ROOF (ASPHALT) | B=R (Building Roofing Final) | ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*) | |||||||||
| RE-ROOF (TILE) | BTR (Building Tile Roof), B=R (Building Roofing Final) | ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*) | |||||||||
| RESIDENCE | BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN= (Building Energy Final) | EUG* (Electrical Underground*), ES (Electrical Service), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) | HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) | PB (Plumbing Base), PTO (Plumbing Top Out), PIN (Plumbing Insulation), P= (Plumbing Final) | |||||||
| SERVICE UPGRADE | BFR (Building Frame), B= (Building Final) | ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES= (Electrical Service and Final), EUG* (Electrical Underground*), E= (Electrical Final) | |||||||||
| SIDING | B= (Building Final) | ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*) | |||||||||
| SOLAR THERMAL (NEW ROOF MOUNT) | BFR (Building Frame), B= (Building Final) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) | HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) | PIN* (Plumbing Insulation*), P= (Plumbing Final) | |||||||
| SOLAR THERMAL (REPLACEMENT ROOF) | BFR (Building Frame), B= (Building Final) | H=* (Heating Final*) | PIN* (Plumbing Insulation*), P=* (Plumbing Final*) | ||||||||
| STUCCO | BLA (Building Lath), B= (Building Final) | ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*) | |||||||||
| TEMP SERVICE (ELECTRIC) | EST (Electrical Service Temporary), E= (Electrical Final) | ||||||||||
| ELECTRIC UNIT HEATER (ADDED TO EXISTING) | ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | ||||||||||
| GAS UNIT HEATER (ADDED TO EXISTING) | ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) | HI* (Heating Inside*), H= (Heating Final) | |||||||||
| WATER HEATER REPLACEMENT | E=* (Electrical Final*) | HI* (Heating Inside*), H=* (Heating Final*) | P= (Plumbing Final) | ||||||||
| WOOD STOVE INSERT | BFR (Building Frame), B= (Building Final) | ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) | |||||||||
| WOODBURNING STOVE (REPLACE) | BFR (Building Frame), B= (Building Final) | ||||||||||
| Project Description | Required Inspections (Hover or tap codes for more info) | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| ELECTRICAL | ES | ER | ERS | ER= | ES= | EST | ESL | EUG | EP | EMR | E= |
| A/C REPLACEMENT | X | ||||||||||
| ADDING RECEPTACLES | X | X | X* | X | |||||||
| ADDITION | X* | X | X* | X | |||||||
| BASEMENT FINISH | X* | X | X* | X* | X* | X | |||||
| BATH EXHAUST FAN (NEW) | X | X | X | ||||||||
| BOILER INSTALL (NEW) | X | X | X | ||||||||
| BOILER REPLACEMENT (W/ VENT) | X* | X* | X* | ||||||||
| DECK | X* | X* | X* | X* | |||||||
| DECK STAIR REPLACEMENT | X* | X* | |||||||||
| DECK WITH COVER (NO ELECTRIC) | X* | X* | |||||||||
| DECK WITH COVER (W/ ELECTRIC) | X* | X | X | X | |||||||
| DETACHED GARAGE (W/O POWER) | X* | X* | X* | X* | |||||||
| DETACHED GARAGE (W/ POWER) | X* | X | X* | X | X* | X | X | ||||
| ELECTRIC PANEL CHANGE-OUT | X | X* | X | X | |||||||
| ELECTRIC PANEL UPGRADE | X | X* | X | ||||||||
| ELECTRIC SUB PANEL (NEW) | X* | X | X | ||||||||
| FIREPLACE FRAMING | X* | X* | X* | ||||||||
| FURNACE REPLACEMENT | X* | ||||||||||
| GARAGE CONVERSION | X* | X | X* | X | |||||||
| HOT TUB (NEW) | X* | X* | X | ||||||||
| INTERIOR REMODEL (NON-STRUCTURAL) | X* | X* | X* | X* | |||||||
| INTERIOR REMODEL (STRUCTURAL) | X* | X* | X* | X* | |||||||
| KITCHEN HOOD (NEW) | X | X | X | ||||||||
| METER RESET (ELECTRIC) | X | X* | X* | X | |||||||
| METER RESET (GAS) | |||||||||||
| NEW A/C | X* | X* | X | ||||||||
| NEW EXTERIOR GAS LINE | |||||||||||
| NEW FIREPLACE INSTALL (GAS) | X | ||||||||||
| NEW INTERIOR GAS LINE | |||||||||||
| NEW WOODBURNING STOVE | |||||||||||
| PATIO COVER | X* | X* | X* | X* | |||||||
| PATIO ENCLOSURE | X* | X | X | X | |||||||
| PERGOLA | X* | X* | X* | X* | X* | X* | |||||
| PV SOLAR (NEW RACK MOUNT) | X | X* | X | X | |||||||
| PV SOLAR (NEW ROOF MOUNT) | X | X | X | ||||||||
| PV SOLAR (REPLACEMENT ROOF MOUNT) | X* | X | |||||||||
| RE-ROOF (ASPHALT) | X* | X* | |||||||||
| RE-ROOF (TILE) | X* | X* | |||||||||
| RESIDENCE | X* | X | X* | X | |||||||
| SERVICE UPGRADE | X | X | X* | X | |||||||
| SIDING | X* | X* | X* | ||||||||
| SOLAR THERMAL (NEW ROOF MOUNT) | X* | X* | X* | ||||||||
| SOLAR THERMAL (REPLACEMENT ROOF) | |||||||||||
| STUCCO | X* | X* | X* | ||||||||
| TEMP SERVICE (ELECTRIC) | X | ||||||||||
| UNIT HEATER (ADDED TO EXISTING) | X* | X | X | X | |||||||
| WATER HEATER REPLACEMENT | X* | ||||||||||
| WOOD STOVE INSERT | X* | X* | X* | ||||||||
| WOODBURNING STOVE (REPLACE) | |||||||||||
| Project Description | Required Inspections (Hover or tap codes for more info) | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| MECHANICAL | HD | HI | HO | HWP | HRR | HV | HLP | HRP | H= | ||
| A/C REPLACEMENT | X | ||||||||||
| ADDING RECEPTACLES | |||||||||||
| ADDITION | X* | X* | X | X | |||||||
| BASEMENT FINISH | X | X* | X | X | |||||||
| BATH EXHAUST FAN (NEW) | X | ||||||||||
| BOILER INSTALL (NEW) | X | X | X | ||||||||
| BOILER REPLACEMENT (W/ VENT) | X* | X | |||||||||
| DECK | |||||||||||
| DECK STAIR REPLACEMENT | X | ||||||||||
| DECK WITH COVER (NO ELECTRIC) | |||||||||||
| DECK WITH COVER (W/ ELECTRIC) | |||||||||||
| DETACHED GARAGE (W/O POWER) | X* | ||||||||||
| DETACHED GARAGE (W/ POWER) | X* | ||||||||||
| ELECTRIC PANEL CHANGE-OUT | |||||||||||
| ELECTRIC PANEL UPGRADE | |||||||||||
| ELECTRIC SUB PANEL (NEW) | |||||||||||
| FIREPLACE FRAMING | |||||||||||
| FURNACE REPLACEMENT | X | ||||||||||
| GARAGE CONVERSION | X* | X | X | ||||||||
| HOT TUB (NEW) | |||||||||||
| INTERIOR REMODEL (NON-STRUCTURAL) | X | X* | X | X | |||||||
| INTERIOR REMODEL (STRUCTURAL) | X | X* | X | X | |||||||
| KITCHEN HOOD (NEW) | X | ||||||||||
| METER RESET (ELECTRIC) | |||||||||||
| METER RESET (GAS) | X | X | |||||||||
| NEW A/C | X | ||||||||||
| NEW EXTERIOR GAS LINE | X | X | |||||||||
| NEW FIREPLACE INSTALL (GAS) | X | X* | X | X | |||||||
| NEW INTERIOR GAS LINE | X | X | |||||||||
| NEW WOODBURNING STOVE | |||||||||||
| PATIO COVER | |||||||||||
| PATIO ENCLOSURE | X* | X* | |||||||||
| PERGOLA | |||||||||||
| PV SOLAR (NEW RACK MOUNT) | |||||||||||
| PV SOLAR (NEW ROOF MOUNT) | |||||||||||
| PV SOLAR (REPLACEMENT ROOF MOUNT) | |||||||||||
| RE-ROOF (ASPHALT) | |||||||||||
| RE-ROOF (TILE) | |||||||||||
| RESIDENCE | X* | X* | X | X | |||||||
| SERVICE UPGRADE | |||||||||||
| SIDING | |||||||||||
| SOLAR THERMAL (NEW ROOF MOUNT) | X* | X | |||||||||
| SOLAR THERMAL (REPLACEMENT ROOF) | X* | ||||||||||
| STUCCO | |||||||||||
| TEMP SERVICE (ELECTRIC) | |||||||||||
| UNIT HEATER (ADDED TO EXISTING) | |||||||||||
| WATER HEATER REPLACEMENT (*PLUMBING ONLY) | * | ||||||||||
| WOOD STOVE INSERT | |||||||||||
| WOODBURNING STOVE (REPLACE) | |||||||||||
| Project Description | Required Inspections (Hover or tap codes for more info) | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| PLUMBING | PB | UBS | PTO | PWO | PT | UWS | PBP | P=S | P= | ||
| A/C REPLACEMENT | |||||||||||
| ADDING RECEPTACLES | |||||||||||
| ADDITION | X | X | X | ||||||||
| BASEMENT FINISH | X | X | X | ||||||||
| BATH EXHAUST FAN (NEW) | |||||||||||
| BOILER INSTALL (NEW) | |||||||||||
| BOILER REPLACEMENT (W/ VENT) | |||||||||||
| DECK | |||||||||||
| DECK STAIR REPLACEMENT | |||||||||||
| DECK WITH COVER (NO ELECTRIC) | |||||||||||
| DECK WITH COVER (W/ ELECTRIC) | |||||||||||
| DETACHED GARAGE (W/O POWER) | |||||||||||
| DETACHED GARAGE (W/ POWER) | |||||||||||
| ELECTRIC PANEL CHANGE-OUT | |||||||||||
| ELECTRIC PANEL UPGRADE | |||||||||||
| ELECTRIC SUB PANEL (NEW) | |||||||||||
| FIREPLACE FRAMING | |||||||||||
| FURNACE REPLACEMENT | |||||||||||
| GARAGE CONVERSION | X* | X* | X* | ||||||||
| HOT TUB (NEW) | |||||||||||
| INTERIOR REMODEL (NON-STRUCTURAL) | X* | X | X | ||||||||
| INTERIOR REMODEL (STRUCTURAL) | X | X | X | ||||||||
| KITCHEN HOOD (NEW) | |||||||||||
| METER RESET (ELECTRIC) | |||||||||||
| METER RESET (GAS) | |||||||||||
| NEW A/C | |||||||||||
| NEW EXTERIOR GAS LINE | |||||||||||
| NEW FIREPLACE INSTALL (GAS) | |||||||||||
| NEW INTERIOR GAS LINE | |||||||||||
| NEW WOODBURNING STOVE | |||||||||||
| PATIO COVER | |||||||||||
| PATIO ENCLOSURE | |||||||||||
| PERGOLA | |||||||||||
| PV SOLAR (NEW RACK MOUNT) | |||||||||||
| PV SOLAR (NEW ROOF MOUNT) | |||||||||||
| PV SOLAR (REPLACEMENT ROOF MOUNT) | |||||||||||
| RE-ROOF (ASPHALT) | |||||||||||
| RE-ROOF (TILE) | |||||||||||
| RESIDENCE | X | X | X | ||||||||
| SERVICE UPGRADE | |||||||||||
| SIDING | |||||||||||
| SOLAR THERMAL (NEW ROOF MOUNT) | X | ||||||||||
| SOLAR THERMAL (REPLACEMENT ROOF) | X* | ||||||||||
| STUCCO | |||||||||||
| TEMP SERVICE (ELECTRIC) | |||||||||||
| UNIT HEATER (ADDED TO EXISTING) | |||||||||||
| WATER HEATER REPLACEMENT | X | ||||||||||
| WOOD STOVE INSERT | |||||||||||
| WOODBURNING STOVE (REPLACE) | |||||||||||